We were unable to load Joobi library for the plugin Debug Traces. If you removed the joobi folder, please also remove this plugin from the Joomla plugin manager.We were unable to load Joobi library for the plugin System plugin for Users. If you removed the joobi folder, please also remove this plugin from the Joomla plugin manager.We were unable to load Joobi library for the plugin Cron Task. If you removed the joobi folder, please also remove this plugin from the Joomla plugin manager.We were unable to load Joobi library for the plugin Joobi Tags. If you removed the joobi folder, please also remove this plugin from the Joomla plugin manager.
Warning: Cannot modify header information - headers already sent by (output started at /home/arihenry/public_html/peoplesrepublicofsouthwark.co.uk/plugins/system/apps_system_plugin/apps_system_plugin.php:14) in /home/arihenry/public_html/peoplesrepublicofsouthwark.co.uk/plugins/system/jat3/jat3/core/parameter.php on line 107
Cycle hire 2

Font Size

Cpanel
We were unable to load Joobi library for the plugin Joobi Tags for Joomla Articles. If you removed the joobi folder, please also remove this plugin from the Joomla plugin manager.
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 0-9

Cycle hire 2

Question reference: 1162 / 2012
Assembly Member: Caroline Pidgeon
Date: June 2012
Question: You have promised to expand the cycle hire scheme into Wandsworth, Hammersmith and Fulham, Lambeth and the Royal Borough of Kensington and Chelsea. Could you please explain why these areas where chosen for expansion?
Answered: Answered
Written response from the Mayor: The current scheme area is mainly located north of the Thames. The Phase 3 expansion area seeks to redress this and balance out the Phase 2 eastern expansion, with a significant proportion of the sites being located south of the river. This includes several areas of low public transport accessibility, regeneration areas, and areas of high cycle hire demand. The Phase 3 zone has been chosen to support increased scheme uptake, improve revenue generation from leisure and local trips, and support local transport priorities identified by boroughs. The Phase 3 expansion includes substantial parts of Wandsworth and Hammersmith & Fulham, as well as additional areas in Lambeth and Kensington & Chelsea. Subject to approval of the full scope of the expansion later in 2012, Phase 3 is planned to be operational by late 2013.
Located in: MQT
Powered by Sigsiu.NET
You are here: Home News MQT Cycle hire 2